top of page

The flood control dam in the Mělník port

The flood control dam with the service road on its crown was built in the Mělník port. The walls of the dam were joined by ground anchors and continuously prestressedfor the prescribed force. The tensioning process was controlled by the DYNAMAG sensors.

Instalace-snimacu-v-pristavisti-Melnik (1).jpg
Monitoring-hotove-konstrukce.jpg
Stavba-hraze-terenni-upravy.jpg
Mereni-v-zime (1).jpg
Stavba-hraze-nasep.jpg

©2025 by IOTEE s.r.o.

bottom of page