top of page

The extradosed steel-concrete bridge in Chotěbuz

The additional prestressed reinforcement was implemented into bridge construction during its large reconstruction. The DYNAMAG sensors were installed onto 12-strands cables. The continual monitoring during the tensioning process and during the load test of the construction was provided.

Snimace-na-dodatecnych-predpinacich-kabelech.jpg
Snimace-na-kabelech-detail.jpg
Staticka-zatezovaci-zkouska-mostu.jpg
Instalace-snimacu-na-kabely.jpg
Zaznam-ze-zatezovaci-zkousky-mostu (1).jpg
Mereni-pri-zatezovaci-zkousce (1).jpg

©2025 by IOTEE s.r.o.

bottom of page